All news
LayoffsPlanned

MasterBrand plans 391 job cuts as a Kinston production line ends

MasterBrand Cabinets plans to eliminate 391 jobs in Kinston, North Carolina, by November 27.

Location
Kinston, NC
Key date
Notice September28; 391 permanent separations by November27,2026
Reported
Announced September 28, 2026 · sources verified October 20, 2026
As of
October 22, 2026
Illustrative graphic for: MasterBrand plans 391 job cuts as a Kinston production line ends
Illustrative graphic, not a photograph of this event

MasterBrand Cabinets plans to eliminate 391 jobs in Kinston, North Carolina, by November 27.

A state filing shared September 28 describes permanent job cuts as the plant ends its Value Semi-Custom production line. Other operations at the facility will continue, so this is not a complete plant shutdown.

The 391 positions relate to a production-line change; other operations at the plant continue.

What is confirmed

  • 391 — Positions scheduled for permanent elimination
  • Notice September28; 391 permanent separations by November27,2026

Dates and scope

  • Figure qualifier: Positions scheduled for permanent elimination.
  • Reported as planned or announced; completion has not been independently confirmed.
  • Source material was reviewed October 20, 2026; later developments may not be reflected.

Sources

Corrections and updates

No corrections to date. Source material reviewed October 20, 2026.